
Bonderson Building (192). The Bonderson building is a Engineering projects lab available to all Cal poly students. The first floor contains the "mustang 60"shop. Here students can laser cut or do manual or CNC machining of parts for their projects. EE students should get their safety certification to use this shop their first quarter on campus. The second floor includes a maker space with an array of 3d printers.
The following resources may be helpful to students:
Lab Hours
EE Lab Schedule
Laboratory |
monday-friday |
saturday |
---|
Senior Project Lab |
8:00 AM-9:00 PM |
9:00 AM-3:00 PM |